New Kitchen

Here we go . . . . on our way to upgrading our kitchen and other family and life experiences!!



Thursday, September 29, 2011

Kitchen Remodel? Oh yeah, we're finally moving forward . . .

These are the cabinets we had built from a local cabinet maker to match the rest of our cabinets. This one we had "feet" attached to make it look like a piece of furniture.




This is one of the original cabinets, an upper cabinet, that will be installed on the wall above the cabinet with the feet.


These corner shelves will be attached to the upper cabinet, on the right side.

This is the microwave, oven and warming drawer appliances tower. To the left is a cabinet where our wine cooler will be "built in".

All the existing cabinets will be torn out in the next week or too and the new ones installed including the ones you see above.

Sunday, September 18, 2011

Ragnar Relay 2011 San Francisco to Napa Valley Sept. 16-17

Click to play this Smilebox slideshow
Create your own slideshow - Powered by Smilebox
This digital slideshow created with Smilebox

What's Ragnar? A 24 hour relay race involving a team of 12 who take turns and run 3 different times to ultimately end up at the designated destination. We ran from San Francisco to Calistoga. It was quite the experience and a whole lot of fun! I, Cami, ran my first leg at around 9:30am 5.4 miles. My second leg was at 7:45pm 3.3 miles and my last leg was at 5am the following morning 5.4 miles. I was challenged but not defeated by any means. It was more of a personal test to see how I'd hold up. There are deffinately going to be more races in my future.